EN
FA Monday, December 6, 2021
  • 05
  • 02
  • 01
The CEO of ICOFC said: seismic operations of Rig, Shorom, and Dudro oil fields and Mokhtar gas field are on the agenda at ICOFC in order to identify structural status of the fields and to eliminate geological ambiguities in this regard.
Chief Executive Officer of Iranian Central Oil Fields Company (ICOFC) announced his company’s readiness for the sustained supply of gas during winter.
Drilling operation and completion of well no. 44 of Dehloran operational region in Ilam province with an initial flow of 1,500 barrels per day was accomplished, using homemade wellhead equipment.
Concurrent with the government week, well No. 75 of Khangiran operational region with a daily production capacity of 1.3 million cubic meters became operational to maintain the gas production ceiling needed in the east and northeast parts of Iran.
The new Iranian Minister of Petroleum Javad Owji, on the first day of his tenure, called for the serious determination and presence of the industry’s staff to overcome the crises and challenges facing the countrys oil and gas industry.
The proposed Minister of Petroleum, Javad Owji, said: "In the new era, the fate of oil and gas fields that have not been determined in the past decades will be determined."
President
Leader
Shana
NIOC
Oil ministry
brochure
map
directorates
linkedin